Off-pump coronary bypass surgery.
Explore the source record for details and available documents.
Biomedical subjects
Publications and source records attributed to Elisabeth Fenwick.
Explore the source record for details and available documents.
OBJECTIVE: To compare the cost and cost-effectiveness of a policy of pre-operative optimisation of oxygen delivery (using either adrenaline or dopexamine) to reduce the risk associated with major elective surgery, in high-risk patients. METHODS: A cost-effectiveness analysis using data from a randomised controlled trial (RCT). In the RCT 138 patients undergoing major elective surgery were allocated to receive pre-operative optimisation employing either adrenaline or dopexamine (assigned randomly), or to receive routine peri-operative care. Differential health service costs were based on trial data on the number and cause of hospital in-patient days and the utilisation of health care resources. These were costed using unit costs from a UK hospital. The cost-effectiveness analysis related differential costs to differential life-years during a 2 year trial follow-up. RESULTS: The mean number of in-patient days was 16 in the pre-optimised groups (19 adrenaline; 13 dopexamine) and 22 in the standard care group. The number (%) of deaths, over a 2 year follow-up, was 24 (26%) in the pre-optimised groups and 15 (33%) in the standard care group. The mean total costs were EUR 11,310 in the pre-optimised groups and EUR 16,965 in the standard care group. Life-years were 1.68 in the pre-optimised groups and 1.46 in the standard care group. The probability that pre-operative optimisation is less costly than standard care is 98%. The probability that it dominates standard care is 93%. CONCLUSIONS: Based on resource use and effectiveness data collected in the trial, pre-operative optimisation of high-risk surgical patients undergoing major elective surgery is cost-effective compared with standard treatment.