PubMed Health⌕ Search

Biomedical subjects

M T Datar

Publications and source records attributed to M T Datar.

2 recordsLinked to original sources

Quick start-up and quick steady-state techniques for UAFFB reactor.

Start-up periods of anaerobic reactors need 2 to 3 month to an year (or even more), presumably because of use of non-acclimated anaerobic seed and its slow growth rate. Aerobes commonly excrete glue-like substance such as slime, which aid in attachment of aerobic biofilm to the filter media. The anaerobes do not produce slime and are continuously washed out of reactor. However they attach themselves to slime matrix produced by others (aerobes). The present studies emphasized on initial creation of slime layer on the surfaces of fixed bed media followed by introduction of acclimated anaerobic biomass in bulk, which was expected to get attached to the slime layer, produce biofilm and in turn reduce start-up time. The results are very encouraging and 'Start-up Technique' finalized during these studies is found to be very effective in reducing the start-up period of laboratory scale UAFFB reactor to as low as 15 days even at high organic loading of 5.95 kg COD/day/cum of reactor. The 'Steady-state Technique' is found to be useful in creating the steady-state condition in minimum period of 15 days on increasing the organic loading rate to 7.66 kg COD/day/cum of reactor.

Bacteria, Anaerobic↗

An analysis of nitrification during the aerobic digestion of secondary sludges.

Investigations were undertaken to study the occurrence and progress of nitrification during aerobic digestion of activated sludge in a wide range of initial concentrations of total solids (1000 to 80 000 mg litre(-1), initial pH range of 4.5 to 10.4 and digestion temperature range of 5 degrees to 60 degrees C. Batch aerobic digestion studies on activated sludge grown on wastewater (enriched with organic solids from human excretal material) indicate that almost complete elimination of the 'biodegradable' matter of the activated sludge was one of the essential prerequisites to initiate nitrification. Favourable ranges of temperature and pH for nitrification were observed to be 25 degrees to 30 degrees C and 6.0 to 8.3, respectively. With all favourable conditions, a minimum period of about 2 days was necessary for population build-up of genera Nitrosomonas and Nitrobacter, and to initiate nitrification. Nitrate formation invariably lagged behind nitrite formation, but under certain conditions both phases of nitrification were observed to progress hand in hand.

Journal Article↗