PubMed Health⌕ Search

PubMed · 10248922

Hospital building: throwing bricks at design.

Abstract

It's no comfort to patients and staff at the Dukeries Centre in Central Nottinghamshire to know that the spring and early summer of 1980 were the wettest for 30 years. The roof of this seven year old maternity unit leaked and the local CHC said in its 1980 annual report: 'Rain water started to leak slowly into patient areas and has gradually increased into what can only be described as a flood. In nursing areas within the unit plastic dustbins and other large containers have had to be used to collect large amounts of water coming through the roof during rainy weather. This has obviously caused considerable inconvenience to both staff and patients and has made the unit more difficult to keep clean.' Repairs to the roof, totalling 150,000 pounds, are being carried out by the district but not soon enough to stop the water causing deterioration to the fabric of wards. The report says: 'It seems to the CHC that something has gone wrong with either the design or construction of the roof.' To find out how often this sort of problem has occurred in new hospitals over recent years, the Journal's Pauline Drummond conducted a survey of structural defects.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

P Drummond. 1980-09-26. Hospital building: throwing bricks at design.. https://pubmed.ncbi.nlm.nih.gov/10248922/

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related citations

Unconfined compressive strength prediction for the ordinary Portland cement-steel slag-silica fume ternary system based on response surface methodology.

This research was undertaken to address environmental concerns associated with industrial solid waste and to reduce cement consumption in geotechnical engineering. It specifically investigates the feasibility of using steel slag (SS) and silica fume (SF) as partial substitutes for ordinary Portland cement (OPC) in soil stabilization. The effects of SS, SF, OPC, and initial moisture content on the unconfined compressive strength (UCS) of stabilized soil were investigated through single-factor experiments and response surface methodology (RSM). The results show that SS and SF can synergistically enhance the strength of stabilized soil, although their interaction effect was not statistically significant within the investigated ranges. Compared with soil stabilized solely with OPC, the addition of 18 % SS and 10 % SF reduced OPC consumption by 3 % without compromising strength. Microstructural and compositional analyses further revealed that SS mainly supplied calcium- and silica-bearing components, while SF provided highly reactive silica and micro-filling effects, jointly promoting hydration reactions and improving the compactness of the stabilized soil matrix. As a result, more hydration products were formed in the OPC/SS/SF-stabilized soil than in the OPC-stabilized soil, which contributed to pore filling and strength enhancement. This study provides useful guidance for the sustainable utilization of industrial solid waste and the low-carbon development of soil stabilization materials.

Construction Materials↗

Evaluation of the radioactivity of the pre-dominant gamma emitters in components used at high-energy proton accelerator facilities.

At a high-energy, high-intensity proton accelerator facility, the accelerator components inside the beam-line tunnel and the concrete wall of the tunnel are activated due to beam loss during operation. During maintenance work inside the tunnel, radiation emitted from these activated materials can cause exposure to radiation workers. In this study, the relation between the surface dose rate of activated materials and the induced radioactivity was considered, and an evaluation of the major radioactivity using the surface dose rate was made. It has been revealed that (22)Na in Al samples and (54)Mn in Fe samples, (60)Co and (54)Mn in Fe samples, and (60)Co in Fe and Cu samples are principal residual radionuclides after a few hundred days of cooling about a few years of cooling and approximately 10 y of cooling, respectively.

Construction Materials↗