PubMed Health⌕ Search

PubMed · 11816469

[Critical pathways and computerized multidisciplinary documentation system].

Abstract

Critical pathways are widely adopted by many large hospitals around the world in order to provide high-quality patient treatment. The development of critical pathways is a lengthy process, and may require the collaboration among physicians, nurses, and staffs in a hospital. The development and implementation of critical pathways at Kanto Medical Center and the transition to a computerized multidisciplinary documentation system took place between 2000 and 2001. The article describes the process of creating the automated documentation system to support the critical pathways. The advantages, pitfalls learned in this integration experience are described.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Takashi Fukaya. 2002. [Critical pathways and computerized multidisciplinary documentation system].. https://pubmed.ncbi.nlm.nih.gov/11816469/

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related citations

Clinical management. Design for living.

91 per cent of patients started treatment within two mounths of referral, compared to 70-80 per cent last year. The last five months has seen rapid progress at a rate of 2 per cent a month. Sustaining improvement depends on leadership, measurement and looking at the whole patient pathway.

Critical Pathways↗

[Clinical pathways -- first results of a systematic IT-supported application at a surgical department of a university hospital].

BACKGROUND AND OBJECTIVE: In analogy to industrial process management, clinical pathways have been introduced for operational process organisation in orthopedic and interventional procedures as well as for conservative treatments. Within this study, introduction and continuous, systematic application of clinical pathways at a surgical department of a university hospital was investigated. METHODS: Analysis was performed by IT-based (SAP/i. s. h.med) evaluation of the registered data regarding pathway violations. Additionally, patients' records were matched with the computerized data for quality assurance of pathway documentation. RESULTS: 501 patients were entered in 16 clinical pathways (31 +/- 39 patients per pathway). The mean period from the introduction of a distinct pathway to the data acquisition of the present study ranged from 2 to 14 months (mean 7+/-7.5 months). Pathway violations correlated with the complexity, but not with the period since the pathway was introduced. Organisational reasons next to medical reasons (i. e. delayed gastric function or wound healing) were the most frequent causes for pathway violations. CONCLUSION: Clinical pathways may not only be realised for operative procedures or conservative treatments, but represent a clinical and administrative management instrument at a surgical department of a university hospital for daily work routine. They are suitable as an instrument for clinical quality and risk management, as an economic control instrument in reorganisation phases as well as in the routine of surgical clinics.

Critical Pathways↗