PubMed Health⌕ Search

PubMed · 15181790

Debating project sustainability.

Abstract

Three Construction Industry Environmental Forum workshops, held in Edinburgh, London and Manchester towards the end of last year, focused on a range of key issues concerning the delivery of appropriate sustainability performance in PFI projects.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

2004. Debating project sustainability.. https://pubmed.ncbi.nlm.nih.gov/15181790/

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related citations

Optimization of coagulation-flocculation process for palm oil mill effluent using response surface methodology.

The coagulation-flocculation process incorporated with membrane separation technology will become a new approach for palm oil mill effluent (POME) treatment as well as water reclamation and reuse. In our current research, a membrane pilot plant has been used for POME treatment where the coagulation-flocculation process plays an important role as a pretreatment process for the mitigation of membrane fouling problems. The pretreated POME with low turbidity values and high water recovery are the main objectives to be achieved through the coagulation-flocculation process. Therefore, treatment optimization to serve these purposes was performed using jar tests and applying a response surface methodology (RSM) to the results. A 2(3) full-factorial central composite design (CCD) was chosen to explain the effect and interaction of three factors: coagulant dosage, flocculent dosage, and pH. The CCD is successfully demonstrated to efficiently determine the optimized parameters, where 78% of water recovery with a 20 NTU turbidity value can be obtained at the optimum value of coagulant dosage, flocculent dosage, and pH at 15 000 mg/L, 300 mg/L, and 6, respectively.

Facility Design and Construction↗