The "golden rules" of CQI, from our experience, could be summarized as follows: 1. Create the appropriate environment first by teaching the Deming principles. 2. Establish effective methods of group communication. 3. Do not focus on individual error. Focus on processes and your system of care. Make certain that case presentations do not spotlight individuals. 4. Look for the common causes of problems. 5. Use statistical methods appropriately. Identify what is clinically important. Make any data collection effort meaningful, and make sure that all members understand why the data is being collected. 6. If an error is identified, ensure that the practitioners involved are active participants in the analysis. 7. Recognize good performance. If something is done well, have the provider present the case to the group. This step is particularly worthwhile if the case illustrates a new process that will remedy a problem other members of the department have experienced.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

J Q Schisler. 1992. Implementing continuous quality improvement: a private practice's experience.. https://doi.org/10.1097/00004311-199230020-00006

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related citations

How can a standard software package for data management in anesthesia be achieved?

Collecting data for administrative, statistical, medical, and organizational purposes is becoming increasingly important in anesthesia. In 1986 the Swiss Society for Anesthesiology decided to create a program that would be compatible for different computers and would expedite data collection. The system developed was called Information System for Operations (ISOP), which was written in the database and programming system Massachusetts General Hospital Utility Multi Programming System (MUMPS). It was installed in eight hospitals and met the initial requirements, but the individual requirements of the hospitals were greatly underestimated. MUMPS has an impressive data storage capability and handling when used in a personal computer (PC) network. The user-interface, however, is inferior to other PC packages, partly because windowing and mouse support were not implemented when the ANSI standard was set. Improved statistical programs, a module for on-line data acquisition, and intensive care unit (ICU) use will be additional modules to the program.

Anesthesia Department, Hospital

Can a clinician predict the technical equipment a patient will need during intensive care unit treatment? An approach to standardize and redesign the intensive care unit workstation.

The technical equipment of today's intensive care unit (ICU) workstation has been characterized by a gradual, incremental accumulation of individual devices, whose presence is dictated by patient needs. These devices usually present differently designed controls, operate under different alarm philosophies, and cannot communicate with each other. By contrast, ICU workstations could be equipped permanently and in a standardized manner with electronically linked modules if the attending physicians could reliably predict, at the time of admission, the patient's equipment needs. Over a period of 3 1/2 months, the doctors working in our 20-bed surgical ICU made 1,000 predictions concerning outcome, equipment need, duration of artificial ventilation, and duration of hospitalization for 300 recently admitted patients. The interviews were made within the first 24 hours after admission. The doctors being interviewed were usually (i.e., in over 90% of cases) unfamiliar with the patient. Information concerning the patient's general state of health, special pre-ICU events, and complications was offered to the interviewed clinician because this information represents standard admission data. It was found that the equipment need (represented by two different setups, "high tech" and "low tech") could be predicted most reliably (96.4% correct predictions) compared with a prediction on outcome of ICU treatment (94.5%), on duration of artificial ventilation (75.4%), and on duration of stay (43.4%). There was no significant (p greater than 0.05) difference in the reliability of predictions between residents and consultants. Factors influencing the postoperative equipment need varied with surgical specialty.(ABSTRACT TRUNCATED AT 250 WORDS)