PubMed Health⌕ Search

PubMed · 3345653

Prolog-based system for nursing staff scheduling implemented on a personal computer.

Abstract

An approach to the problem of nursing staff scheduling in a hospital is presented. For scheduling nurses, a variety of requirements with varied levels of significance has to be taken into account simultaneously. Because of the nature of the problem, where it is difficult to define what is the optimal solution in a strict sense, we aimed at automating scheduling by following the manual method in a faithful manner. A system for nurse scheduling has been implemented on a personal computer using Prolog. It determines favorable shift assignments on a day-to-day basis, referring to the information accumulated in the data base. In Prolog, various requirements can be expressed with relative ease, and the process of the manual method can be incorporated into the system in a natural way. The computer simulation has been conducted to test the system performance, and the obtained results demonstrated the validity of the approach.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

M Okada. 1988. Prolog-based system for nursing staff scheduling implemented on a personal computer.. https://doi.org/10.1016/0010-4809(88)90042-0

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related citations

Use of timelines in senior design--an efficient project management tool for faculty.

An important part of any multi-tasked project or undertaking is a work plan. Large contractors with multi-year design projects use a work plan to schedule resources and identify critical design decisions; a smaller company may map out the course and order of work as well as schedule resources. Either way, the work plan is an indispensable tool that assists the project manager in the planning and timely execution of the project. Introduced is the concept of the timeline (or work plan) and its utilization in an Undergraduate Senior Design Course by both Faculty and Student as a Project Management Tool and device from which to chart student progress towards completion of course requirements. Discussed are examples of student project planning and comments with regards to the effectiveness of project planning for the student as well as a discussion of how this device has assisted faculty in charting student progress towards project completion, meeting course requirements, and grading. Project and Time Management issues described in this paper are through the Senior Design Program at the University of Connecticut (UCONN) with National Science Foundation Senior Design Projects to Aid Persons with Disabilities and industry-sponsored projects [1].

Management Information Systems↗