PubMed Health⌕ Search

PubMed · 9203263

Critical pathways and cost-effective practice.

Abstract

With increasing pressure by third-party payers and federal reimbursement systems to reduce health care expenditures, cost-effective means to care for the resource intensive vascular surgical population must be explored. The challenge of meeting these cost-saving priorities while maintaining or improving quality of care can result in conflicting demands on surgeons, particularly in academic practices. The adaptation of an industrial management tool-the critical pathway method-to health care delivery is an attempt to reduce length of stay and improve efficiency. Utilization of vascular nurse practitioners, concentration of vascular patients into a dedicated unit, reduction in angiography through more aggressive use of the vascular laboratory, and optimal use of rehabilitation units and skilled nursing facilities are important adjuncts to reduce length of stay without sacrificing quality of care. This report describes the critical pathway method as implemented in a university teaching hospital, and the integration of other modalities in the care of vascular patients that has reduced length of stay by as much as 40% for some vascular surgical procedures.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

R B Patterson, D Whitley, K Porter. 1997. Critical pathways and cost-effective practice.. https://pubmed.health/record/pubmed%3A9203263/critical-pathways-and-cost-effective-practice

Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite PubMed Health by Indiciae: BibTeX · RIS.

KEEP EXPLORING

Related citations

Cognitive analysis of physicians and nurses cooperation in the medication ordering and administration process.

The objective of this study was to analyse physician-nurse cooperation in the medication ordering and administration process from a cognitive point of view. In this paper, we compared two work organizations characterized by: (1) a synchronous cooperation engendered by common doctor-nurse medical rounds and (2) an asynchronous situation characterized by split physician's and nurse's rounds. Both organizations worked with paper-based documentation systems. We relied on a cooperation cognitive architecture model and used specific methods from cognitive ergonomics to analyse physicians' and nurses' activity, communications and cooperation. The analysis of doctor-nurse dialogues during the medical rounds demonstrated that in the synchronous situation, the nurses actively participated in the medication ordering process. Such dialogues supported the elaboration of shared knowledge in the form of a common frame of reference (COFOR) which both actors rely on to control the entire medication process, and more precisely the coordination of their actions. Document analysis showed that the orders were far from exhaustively documented. However, self-confrontation interviews with the nurses demonstrated that, except for a small number of ill-documented orders, they were able to accurately retrieve the physician's complete intended orders. In this work organization, the nurse was able to control the medication administration process at a high level, because she understood the highest level of strategic control of the medication ordering carried out by the physician. In the asynchronous situation, the results were reversed. The nurses no longer participated in the decision making phase of the medication process. Doctor-nurse communications were rare, and their shared knowledge about the patient was weakened. Although written orders proved to be better documented, the nurses suffered from a lack of knowledge on the patient's medical case and the particular context of the medical decision making when confronted with incomplete or ambiguous orders. In this work organization, the nurse would find herself restrained to low level process control and confined in a reactive, instead of anticipative, management mode. This latter work organization is very similar to the CPOE situation we observed in previous studies, where the coordination of physicians' and nurses' actions was delegated to the system. We suggest that it is essential to take these organizational and cognitive aspects into account when (re-)designing CPOE applications.

Cardiology Service, Hospital↗

Managed Care Network for the assessment of cardiac problems in children in a district general hospital: a working model.

AIM: To assess a model for cardiology assessments in children with suspected heart disease by a general paediatrician with special expertise in paediatric cardiology (PsePC) in a district general hospital. METHODS: A new monthly "screening" clinic was established in May 2004 by the PsePC to reduce the burden of new referrals on outreach tertiary paediatric cardiology services. All patients were to have echocardiograms as part of their referral for cardiac assessment. Over a one year period (May 2004-April 2005), through audit, details of referrers, indications for referral, echocardiography assessments, and subsequent management were recorded. This was compared with the pattern of patients seen in the joint paediatric cardiology outreach clinics over a two year period (May 2003-April 2005). RESULTS: In the "screening" clinic, there were 75 appointments for 65 patients seen in 12 months. Fifty five of these patients had normal echocardiographic studies. Of the 47 referrals with heart murmurs in asymptomatic children, four had structurally abnormal hearts on echocardiographic assessment. Between May-October 2003 and November 2003-April 2004, the number of new patients with normal echocardiographic studies seen in the paediatric cardiology outreach clinic was 33/106 (31%) and 28/110 (25.4%) respectively. Following the introduction of the "screening" clinic, the number decreased to 21/99 (21%) during May-October 2004, and 10/102 (9.8%) during November 2004-April 2005. CONCLUSION: This model can work effectively in order to identify pathology requiring input of a paediatric cardiologist more appropriately. Paediatricians with specific training in paediatric cardiology are potentially well equipped to provide this basic screening service.

Cardiology Service, Hospital↗

[A new tool for retrieving clinical data from various sources].

BACKGROUND: A doctor's tool for extracting clinical data from various sources on groups of hospital patients into one file has been in demand. For this purpose we evaluated Qlikview. MATERIAL AND METHODS: Based on clinical information required by two cardiologists, an IT specialist with thorough knowledge of the hospital's data system (www.dips.no) used 30 days to assemble one Qlikview file. Data was also assembled from a pre-hospital ambulance system. RESULTS: The 13 Mb Qlikview file held various information on 12430 patients admitted to the cardiac unit 26,287 times over the last 21 years. Included were also 530,912 clinical laboratory analyses from these patients during the past five years. Some information required by the cardiologists was inaccessible due to lack of coding or data storage. Some databases could not export their data. Others were encrypted by the software company. A major part of the required data could be extracted to Qlikview. Searches went fast in spite of the huge amount of data. Qlikview could assemble clinical information to doctors from different data systems. Doctors from different hospitals could share and further refine empty Qlikview files for their own use. When the file is assembled, doctors can, on their own, search for answers to constantly changing clinical questions, also at odd hours.

Cardiology Service, Hospital↗