PubMed Health⌕ Search

PubMed · 9659640

Bipolar pacemaker leads: new materials, new technology.

Abstract

This commentary is in response to a review published earlier in this journal. It is intended to provide additional information and supplement the original paper. A short review of the failure mechanisms of polyurethane pacing lead materials is provided. Two specific degradation mechanisms, environmental stress cracking and metal ion oxidation, are discussed. Environmental stress cracking has been extensively studied and is a well understood failure mechanism. Methods for reducing the problem have been developed and tested in vivo. As a result, stress cracking failures can be virtually eliminated. Metal ion oxidation failures now dominate pacing lead recalls. Two new materials, polycarbonate urethanes and ethylenetetrafluoroethylene, have been introduced as insulators for pacing leads. These materials do not fail by stress cracking and preliminary test results are very positive.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

J A Schmidt, L J Stotts. Bipolar pacemaker leads: new materials, new technology.. https://doi.org/10.3109/08941939809032183

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related citations

Tip cooling effect and failure mechanism of field-emitting carbon nanotubes.

The cooling effect accompanying field electron emission has been considered for a single carbon nanotube (CNT) used as a field emission (FE) electron source. An improved model for the failure mechanism of field emitting CNTs has been proposed and validated. Our model predicts a maximum temperature (T-max) located at an interior point rather than the tip of the CNTs, and the failure of the CNT emitters tends to take place at the T-max point, inducing a segment by segment breakdown process. A combination of Joule heating and electrostatic force effect is proposed responsible for initiating the failure of the field emitting CNT and validated by in situ FE observation.

Equipment Failure↗

[Importance of an initial check-up for diagnostic radiology apparatus management].

The management of apparatus for diagnostic imaging is an important job for radiological technologists. In the last 10 years we have encountered 2227 malfunctions in 3652 days. We detected 163 cases at the initial check-up, which accounted for 7.3% of total cases. By performing an initial check-up, we detected one malfunction every 21 days and were able to keep the effects of mishaps to a minimum, prevent accidents, and obtain stable-quality images.

Equipment Failure↗