PubMed Health⌕ Search

PubMed · 9917466

Evidence-based guidelines and critical pathways for quality improvement.

Abstract

Clinical practice guidelines have a long and distinguished tradition in pediatrics. Currently, the American Academy of Pediatrics has developed more than 15 practice guidelines and more than 250 clinical policy statements. In the past, practice guidelines have been used to improve care through the dissemination of evidence-based, clinically effective practices to pediatric practitioners. In the current environment this purpose has been broadened to include cost reduction, standardization of practice, and reduction of medical liability. This has led to both confusion and distrust on the part of the pediatrician. Practice guidelines are best understood as a tool to insure that children receive evidence-based care. They are best used in association with a set of outcome and performance measures that provide feedback to clinicians and allow for modification of the guidelines to meet the needs of the local patient population. The quality of practice guidelines is directly dependent on the quality of the medical evidence supporting the recommendation. Unfortunately only a small percentage of the evidence supporting practice guidelines comes from randomized clinical trials with the majority of the evidence coming from expert clinical panels. The success of practice guidelines in improving care for children has yet to be convincingly demonstrated. Currently, there is a dearth of well designed studies that document the effectiveness of practice guidelines. Their ultimate effectiveness will depend on both an improved evidence base and effective strategies for rapid dissemination of the recommendations. The development of evidence-based practice guidelines does not insure that it will have a major impact on physician practice. In the past, effective dissemination of new knowledge has been a long process, often taking years. This cycle time can be dramatically shortened through the development of networks of practice sites that share knowledge and experience in the implementation of practice guidelines and the use of strategies that take advantage of key groups in the dissemination process. When used appropriately, practice guidelines can provide an important adjunct to clinical research by facilitating the dissemination of new clinical findings and can provide an important platform for encouraging innovations in patient care.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

D A Bergman. 1999. Evidence-based guidelines and critical pathways for quality improvement.. https://pubmed.ncbi.nlm.nih.gov/9917466/

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related citations

Clinical management. Design for living.

91 per cent of patients started treatment within two mounths of referral, compared to 70-80 per cent last year. The last five months has seen rapid progress at a rate of 2 per cent a month. Sustaining improvement depends on leadership, measurement and looking at the whole patient pathway.

Critical Pathways↗

[Clinical pathways -- first results of a systematic IT-supported application at a surgical department of a university hospital].

BACKGROUND AND OBJECTIVE: In analogy to industrial process management, clinical pathways have been introduced for operational process organisation in orthopedic and interventional procedures as well as for conservative treatments. Within this study, introduction and continuous, systematic application of clinical pathways at a surgical department of a university hospital was investigated. METHODS: Analysis was performed by IT-based (SAP/i. s. h.med) evaluation of the registered data regarding pathway violations. Additionally, patients' records were matched with the computerized data for quality assurance of pathway documentation. RESULTS: 501 patients were entered in 16 clinical pathways (31 +/- 39 patients per pathway). The mean period from the introduction of a distinct pathway to the data acquisition of the present study ranged from 2 to 14 months (mean 7+/-7.5 months). Pathway violations correlated with the complexity, but not with the period since the pathway was introduced. Organisational reasons next to medical reasons (i. e. delayed gastric function or wound healing) were the most frequent causes for pathway violations. CONCLUSION: Clinical pathways may not only be realised for operative procedures or conservative treatments, but represent a clinical and administrative management instrument at a surgical department of a university hospital for daily work routine. They are suitable as an instrument for clinical quality and risk management, as an economic control instrument in reorganisation phases as well as in the routine of surgical clinics.

Critical Pathways↗