PubMed Health⌕ Search

SEARCH · PubMed Health

Results for “Task Performance and Analysis”

Explore indexed PubMed citations for clinical trials, systematic reviews and public health research. Read source abstracts and follow each citation to its original PubMed record.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11Linked to original sources

Master standard data quantity food production code. Macro elements for synthesizing production labor time.

Preparation procedures of standardized quantity formulas were analyzed for similarities and differences in production activities, and three entrée classifications were developed, based on these activities. Two formulas from each classification were selected, preparation procedures were divided into elements of production, and the MSD Quantity Food Production Code was applied. Macro elements not included in the existing Code were simulated, coded, assigned associated Time Measurement Units, and added to the MSD Quantity Food Production Code. Repeated occurrence of similar elements within production methods indicated that macro elements could be synthesized for use within one or more entrée classifications. Basic elements were grouped, simulated, and macro elements were derived. Macro elements were applied in the simulated production of 100 portions of each entrée formula. Total production time for each formula and average production time for each entrée classification were calculated. Application of macro elements indicated that this method of predetermining production time was feasible and could be adapted by quantity foodservice managers as a decision technique used to evaluate menu mix, production personnel schedules, and allocation of equipment usage. These macro elements could serve as a basis for further development and refinement of other macro elements which could be applied to a variety of menu item formulas.

Animals↗

Food production relationships between entrée combinations and forecasted demand.

Macro elements and values for associated Time Measurement Units were applied to three classifications of entrées to synthesize production time for 100, 300, and 500 portions. Average handling and process time for each classification and time per portion were calculated. Data revealed that roast and single-item entrées required greater average handling time than combination entrées, because more individual handling of portions was required as forecasted demand increased. Process time for combination and single-item entrées increased as forecasted demand increased. The time for the single-item classification doubled for 300 and 500 portions, because oven capacity was exceeded. Production time data were applied to six combinations (menu mixes) and quantity levels of entrée classifications to determine production feasibility in a simulated foodservice system. Production problems were encountered in five of the six menu mixes because of system constraints. This study indicated that total production time estimates would be useful to foodservice managers when planning a menu mix, scheduling production personnel, and forecasting labor costs.

Food Handling↗