PubMed Health⌕ Search

PubMed · 11825282

Requirements development for a patient computing system.

Abstract

Critical parts of the software development life cycle are concerned with eliciting, understanding, and managing requirements. Though the literature on this subject dates back for several decades, practicing effective requirements development remains a current and challenging area. Some projects flourish with a requirements development process (RDP) that is implicit and informal, but this approach may be overly risky, particularly for large projects that involve multiple individuals, groups, and systems over time. At Partners HealthCare System in Boston, Massachusetts, we have applied a more formal approach for requirements development to the Patient Computing Project. The goal of the project is to create web-based software that connects patients electronically with their physician's offices and has the potential to improve care efficiency and quality. It is a large project, with over 500 function points. Like most technological innovation, the successful introduction of this system requires as much attention to understanding the business needs and workflow details as it does to technical design and implementation. This paper describes our RDP approach, and key business requirements discovered through this process. We believe that a formal RDP is essential, and that informatics as a field must include proficiencies in this area.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

J S Wald, L A Pedraza, C A Reilly, M E Murphy, G J Kuperman. 2001. Requirements development for a patient computing system.. https://pubmed.ncbi.nlm.nih.gov/11825282/

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related citations

Sediment-based evidence of platinum concentration changes in an urban lake near Boston, Massachusetts.

Emission from automobile catalysts has resulted in elevated platinum concentration in the urban and roadside environment. The work presented here investigates the chronological record of platinum in sediments from the Upper Mystic Lake near Boston, MA, and aims at providing a better understanding of the environmental platinum cycle. Sediment cores were collected by freeze-coring and dated using 210Pb activities, laminations, and depth profiles of elements with a well-known history. Platinum concentrations were determined by quadrupole ICP-MS. While platinum concentration remained relatively low and steady from 1870 to 1975 (<5 ng g(-1)), the time of automobile catalyst introduction is followed by a sharp concentration increase, reaching a plateau in 1992 with 29.2 ng g(-1). Platinum deposition likewise remains low with 0.8 microg m(-2) yr(-1) before 1975, increases from 1975 to 1990, and then remains relatively constant throughout the 1990s with a deposition rate of 7.2 microg m(-2) yr(-1). The average size for Pt-containing particles was estimated to be 17 microm, corresponding to the deposition of approximately 14,000 particles m(-2) yr(-1).

Boston↗

Nature in 2003.

Explore the source record for details and available documents.

Boston↗