PubMed Health⌕ Search

PubMed · 16941891

Translating visions into realities.

Abstract

The overall vision and the building concept. The overall vision with individual buildings that have focal points for the related medical treatment may seem to increase both investment and operational cost, especially in the period until the total hospital is finished (2014). The slogan "Better services at lower cost" is probably a vision that will prove to be hard to fulfil. But the patients will probably be the long-term winners with single rooms with bathroom, high standards of service, good architecture and a pleasant environment. The challenge will be to get the necessary funding for running the hospital. The planning process and project management Many interviewees indicate how difficult it is to combine many functions and requirements in one building concept. Different architectural, technical, functional and economic interests will often cause conflict. The project organisation HBMN was organised outside the administration of both STOLAV and HMN. A closer connection and better co-operation with STOLAV may have resulted in more influence from the medical employees. It is probably fair to anticipate that the medical employees would have felt more ownership of the process and thus be more satisfied with the concept and the result. On the other hand the organisation of the project outside the hospital administration may have contributed to better control and more professional management of the construction project. The management for planning and building (technical programme, environmental programme, aesthetical The need for control on site was probably underestimated. For STOLAV technical department (TD) the building process has been time-consuming by giving support, making controls and preparing the take-over phase. But during this process they have become better trained to run and operate the new centres. The commissioning phase has been a challenging time. There were generally more changes, supplementation and claims than anticipated. The investment costs are nearly on budget, but the concept will have a negative effect on the running costs of the hospital. The budgets for running both the old and new hospital until phase 2 is finished have not been calculated properly and can reduce the level of ambition in the further process. The moving in phase was a little postponed for some of the centres. Only the laboratory centre has moved in on time. It was realised immediately that the buildings services had not been tested out and adjusted properly. In addition it was acknowledged that there should have been a better training programme for the new organisation before moving in. This situation was extremely challenging for the medical employees. With experience from building phase 1, HBMN decided to change the contract model for building phase 2 to a partnering process. That means higher involvement of suppliers and subcontractors with a goal to improve both quality and efficiency. A greater involvement of all participants is needed to share the risk but also reduce costs.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Arne Nesje. 2006. Translating visions into realities.. https://pubmed.ncbi.nlm.nih.gov/16941891/

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related citations

Consolidations and closures: an empirical analysis of exits from the hospital industry.

This paper investigates the pre-exit characteristics of hospital mergers, acquisitions, and closures. We estimate competing risk hazard models using an 18-year national data set that spans the wave of closures in the 1980s and of mergers in the 1990s. Evidence shows that weak productivity of the hospital is a strong determinant for closures while competitive pressures are more influential in the decision to consolidate. Thus, increased market power, relative to cost reductions, appears to play a larger role in the merger decision. Our results also provide insight into possible correlations between mergers and closures.

Efficiency, Organizational↗

'Wet Reads' in the age of PACS: technical and workflow considerations for a preliminary report system.

Communication between clinicians, technologists, and radiologists has become more complex, with Picture Archiving and Communication Systems (PACS) now allowing the radiologist to be removed from the physical location of the patients and the site of imaging. With these changes, effective communication becomes an ongoing challenge. Efficient communication of study interpretations has also become a priority for radiologists as they struggle to maintain relevance and provide added value to patient care when clinicians have ready access to radiology images. The purpose of this paper is to share our experience in developing and implementing the Collaborative Notification System (CNS), a communication tool used to inform referring clinicians of urgent findings-a.k.a. "wet reads." The system utilizes a system of web pages integrated into PACS for the sending and receiving of succinct messages to provide clinical information at the point of need. A second system of pager alerts provides notification of the need for such communication through a relatively unintrusive, one-way, acknowledged alert system. The CNS provides asynchronous, integrated communication for the reporting of urgent and emergent radiology findings in a complex, geographically distributed medical environment.

Efficiency, Organizational↗