PubMed HealthSearch

PubMed · 4746774

[Program planning of educational centers using serial construction].

Abstract

The source did not provide an abstract. Follow the original record for more information.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

D Hundertmark. 1973. [Program planning of educational centers using serial construction].. https://pubmed.ncbi.nlm.nih.gov/4746774/

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related citations

An engineer's perspective of the intervention research workshop.

As an engineer practicing in the area of engineering controls for the reduction of occupational exposures to hazardous agents, the Intervention Research Workshop studies appeared to be effective for the studied situations, yet the models may not be applicable across a wide range of intervention possibilities. A more generic model might be more appropriate, perhaps a business model. Dr. W. Edwards Deming has proposed a model for the production of goods and services. If we can view interventions as products which need to be sold to potential customers, perhaps this type of model would be more effective across a wide range of intervention strategies.

Engineering

A quality assurance program for ancillary high technology devices on a dual-energy accelerator.

Our facility has added high-technology ancillary devices to our dual-energy linear accelerator. After commissioning and acceptance testing of dual asymmetric jaws, dynamic wedge, portal imaging, and multileaf collimation (MLC), quality assurance programs were instituted. The programs were designed to be both periodic and patient specific when required. In addition, when dosimetric aspects were affected by these technologies, additional quality assurance checks were added. Positional accuracy checks (light and radiation) are done for both asymmetric jaws and MLC. Each patient MLC field is checked against the original simulation or digitally reconstructed radiographs. Off-axis factors and output checks are performed for asymmetric fields. Dynamic wedge transmission factors and profiles are checked periodically, and a patient diode check is performed for every new dynamic wedge portal. On-line imaging checks encompass safety checks along with periodic measurement of contrast and spatial resolution. The most important quality assurance activity is the annual review of proper operation and procedures for each device. Our programs have been successful in avoiding patient-related errors or device malfunctions. The programs are a team effort involving physicists, maintenance engineers, and therapists.

Engineering