PubMed HealthSearch

PubMed · 8734689

Assembling a performance improvement committee before Joint Commission evaluation.

Abstract

The source did not provide an abstract. Follow the original record for more information.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

D Milito. 1996-05-15. Assembling a performance improvement committee before Joint Commission evaluation.. https://doi.org/10.1093/ajhp%2F53.10.1195

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related citations

Timeliness of urinalysis: a College of American Pathologists Q-probes study of 346 small hospitals.

OBJECTIVE: To explore preanalytic handling of urinalysis specimens. DESIGN: The study was a College of American Pathologists Q-Probes study consisting of two parts. The first part was a questionnaire about participants' urinalysis practices. The second part required collection of information from four specific urinalysis specimens per shift on 30 consecutive days or from 200 urine specimens, whichever occurred first. SETTING: Three hundred forty-six small hospitals enrolled in the Small Hospital Q-Probes program. MAIN OUTCOME MEASURES: Compliance with guidelines requiring nonrefrigeration and specimen measurement within 2 hours of collection, and identification of practices associated with better performance. RESULTS: Almost 50,000 urinalysis specimens were analyzed. About 68% of the specimens were measured without prior refrigeration, 2.3% were refrigerated before, 17.9% were refrigerated after, and 4.5% were refrigerated before and after arrival in the laboratory. Aggregate analysis indicated that 11.2% of never-refrigerated specimens exceeded the recommended 2-hour time standard before analysis. For inpatients and outpatients, respectively, 64% and 77% of laboratories were able to meet the 2-hour goal 90% of the time. Improved performance was associated statistically with ordering urinalysis stat, an enforced policy of specimen rejection for delayed transport of inpatient specimens, and the listing of a collection time for outpatient specimens. CONCLUSIONS: A large number of urinalysis specimens exceeded current quality guidelines for handling. Laboratories must monitor and improve preanalytic handling of urinalysis specimens.

Hospital Bed Capacity, 100 to 299

Redesign for patient satisfaction.

In this era of changing health care systems, the word redesign is often linked with mergers, layoffs, or an economic move to balance the bottom line. Redesign is often perceived as a way to reduce the need for professional nurses by eliminating job functions. In this cost-cutting milieu, however, the most important factor--the patient--has been put aside. The article explores what factors contribute to patient satisfaction and describes the redesign process that was implemented at one institution to increase patients' satisfaction during hospitalization.

Hospital Bed Capacity, 100 to 299